Marine Terminal Complex
(MTC)

comprised of 3 terminals
located in the
Yuzhny Seaport,
Black Sea (Odessa region, Ukraine)

  • Map point
    Located in the Adjalykskiy Liman (estuary) in the Northeastern part of Black Sea (Odessa Region, Ukraine)
  • Waves
    Black Sea's largest port with ship channel depth of 21 m and width 100 m
  • Piece
    Total length of channel 11 km and width 1.1 km
  • Calendar
    The port is open to navigation all year
  • Ship
    Ukraine’s only cargo port capable of receiving vessels of the Capesize and Newcastlemax class with DW up to 200,000 tons
  • Owned by State
  • Handles the following types of cargo:
  • Bulk cargo, general cargo, containers, chemicals, vegetable oils, oil and oil products
  • Export countries include the United States of America, Latin America, Middle East, SouthEastern Asia, Black Sea and Mediterranean Sea basin countries
  • Designed to accommodate 39 berths, 26 are already operating terminals
  • Excellent infrastructure connection: railway, national and international roads, river ports
  • Our Marine Terminal Complex consists of terminals that go under the following numbers: 38, 38/1 and 38/2
  • The terminals are also part of the Yuzhny Seaport State Development Program
Graphic

ABOUT MTC

Marine
Terminal
Complex

Latitude

Latitude

Longitude

Longitude

Port's position:

Latitude 46°36′N

Longitude 31°00′E

  • Puzzle
    Total land area: 80 hectares
  • Giria
    Projected capacity: 10 million tons per year
  • Coins
    Project Cost Estimates: $200 – 250 million
  • Calendar
    Ready to operate: first terminal in 2021; Marine Terminal Complex in 2023
#1 Grain terminal
[berth No.38/1]
Land area – 35.3 hectares
Length of berth – 300 m
#2 Container terminal
Land area – 18.1 hectares
Shares the berth No. 38/2
#3 General Cargo terminal
[berth No. 38/2]
Land area – 26.4 hectares
Length of berth – 400 m
The complex is located at the Yuzhny Seaport entry and consists of the following terminals:

Grain Terminal

  • Berth
    [berth No. 38/1]
  • Puzzle
    Land area – 35.3 hectares
  • Waves
    Length of berth – 300 m
  • grain
    Transshipment of grain – 5.5 million tons/year, incl.oil – 200,000 tons/year
  • Sheap
    Construction of oil-extracting factory; flour milliang plant

Container Terminal

  • Berth
    [berth No. 38]
  • Puzzle
    Land area – 18.1 hectares
  • Berth
    Shares the berth No. 38/2
  • Building
    Transshipment – 2.3 million tons/year
  • Strelki Tumblery
    Modern cargo handling equipment

General Cargo terminal

  • Berth
    [berth No. 38/2]
  • Puzzle
    Land area – 26.4 hectares
  • Waves
    Length of berth – 400 m
  • Building
    Transshipment – 2.2 million tons/year
  • Crane
    Modern cargo-handling equipment

Development Status

Marine Terminal Complex

Project accepted and incorporated in the development strategy plan of YUZHNY Port
Technical conditions 30 MW: requested
Feasibility study: done
Land allocation project: done
Land parcel: secured
Technical conditions for railway 1.5 km: requested
EIA: done
Water funds project: done

TIMELINE

Timeline Timeline